Biodiesel Power Plant SPE - Luminus to Harelbeke
En-Bio was responsible for the design of the DeNOx, writing the specifications, organizing and evaluating the final contract with the contractor, preparing the necessary building plans and following up the construction.
The project is part of the commitment of the sector to reduce NOx. This involved that the existing plant was equipped with catalytic De-NOx to achieve a reduction of 90% of NOx.
In line with the existing draft a De-NOx was placed per engine with a bypass. The plant serves both as a tertiary reserve but also as black start capability.
Some technical details
Type: Diesel power plant
Net Connection: 36 kV through airline
Power pack: 8 diesel engines of 10 MWe
Investment: € 10 mio
Fuel: RBD Palm stearine
Electricity production: 83 MWe
Flue gas flow and temperature: 70.000 Nm ³ / h - 350 ° C
Reduction of NOx with ammonia: 90% with 7.5 ppm NH3 slip
Project Data
Total investment: € 10 mio
Implementation period of 8 months starting in Q2 / 2008